Plan Portland Concrete Quantity Before You Order
Use this Concrete Calculator in Portland, OR to estimate concrete for slabs, patios, driveways, sidewalks, footings, piers, walls and curbs. Calculate cubic yards, cubic feet, cubic meters, approximate concrete bags and optional ready-mix material cost before contacting a local supplier.
Choose the shape that best matches your project and enter actual finished dimensions.
Estimate concrete for rectangular patios, pads, floors and similar slab-on-ground projects.
Material estimate only. Verify thickness, reinforcement, base, joints, drainage, permits and structural requirements separately.
Estimate rectangular driveway, sidewalk, walkway or replacement-panel concrete.
If work touches the public right-of-way, verify Portland permits, standard plans and inspection requirements before starting.
Choose a continuous rectangular footing or a round pier / post footing.
Volume only. Footing dimensions, reinforcement, soil bearing, structural design and structural compliance require project-specific design.
Estimate linear wall, stem wall, curb or similar rectangular concrete sections.
Material volume only. Verify wall, retaining, curb and right-of-way requirements before construction.
Convert project dimensions into the standard ready-mix ordering unit.
Approximate 40, 60 and 80 lb bag quantities for smaller Portland projects.
Use a local supplier quote and plan truck access before placement day.
Check Portland permits and standard plans when work affects regulated construction or public right-of-way.
A Concrete Calculator in Portland helps homeowners, contractors, estimators and property managers turn project dimensions into a practical material quantity. Whether the work is a backyard patio, residential driveway, sidewalk replacement, garage slab, footing, pier, retaining-wall footing or curb section, the starting point is concrete volume.
This Portland concrete calculator supports several common shapes because local projects are not all simple slabs. The Slab & Patio calculator handles rectangular flatwork. Driveway & Sidewalk is optimized for longer rectangular pours. Footing & Pier switches between a continuous footing and round pier geometry. Wall & Curb calculates long rectangular concrete sections.
The result shows exact mathematical volume and an adjusted planning quantity after the user-selected extra percentage. It also converts the order into cubic feet, cubic yards and cubic meters, estimates common bag quantities, and can multiply the cubic-yard quantity by a price entered from a local ready-mix quote.
The quantity depends entirely on finished dimensions and thickness. A concrete slab is calculated by multiplying length × width × thickness after putting every measurement into compatible units. Since ready-mix concrete in the United States is normally discussed in cubic yards, cubic feet are divided by 27.
Cubic yards = cubic feet ÷ 27.
A 20 ft × 12 ft patio that is 4 inches thick contains 80 cubic feet of concrete mathematically. That is about 2.96 cubic yards before any extra allowance. The calculator then applies the percentage you enter to create a planning order quantity.
Do not confuse square footage with concrete volume. Square feet describe surface area; concrete orders also require thickness. A 240-square-foot slab at 4 inches thick requires substantially less concrete than the same 240-square-foot slab at 6 inches thick.
Portland concrete quantity planning can cover patios, garage slabs, driveway sections, sidewalks, equipment pads, footings, piers, foundation walls, retaining-wall footings, curb work, commercial site concrete and public-improvement projects. Projects range from private residential flatwork to infill development, larger commercial construction and transportation-related improvements, so the estimate should always use actual finished dimensions or approved project plans.
Concrete quantity is only one part of a compliant Portland construction project. Portland Permitting & Development manages building permits, development review, inspections, code enforcement and public-works permits, while Oregon specialty codes establish the statewide technical building-code framework.
As of August 2026, the 2025 Oregon Structural Specialty Code (OSSC) is mandatory for applicable commercial structural work; Oregon Building Codes Division states that it became effective October 1, 2025 and mandatory April 1, 2026. For one- and two-family dwellings and townhouses, the 2023 Oregon Residential Specialty Code (ORSC) remains the current adopted residential code. Oregon has begun the 2026 ORSC adoption process with an anticipated October 1, 2026 adoption date, but that future edition should not be treated as the currently effective residential code yet.
Use the official Oregon Adopted Codes, Portland Permitting & Development and Apply for Permits pages to verify the requirements that apply to the specific project.
If concrete work affects a sidewalk, driveway ramp, curb, paving section or another public-right-of-way feature, the cubic-yard estimate should be paired with Portland Bureau of Transportation (PBOT) permit and design requirements.
Portland states that installing or changing a driveway always requires a permit. Work within the public right-of-way—typically including the driveway portion crossing the sidewalk and connecting to the street—may require a Minor Improvement Permit or Public Works Permit depending on the project scope.
Portland also publishes a voluntary sidewalk, curb or driveway repair permit process. For those repairs, the City requires a minimum of two inspections: one for concrete forms or pavement base before the pour or paving, and one after the repair is complete.
Review the official Portland Driveway Standards, Sidewalk, Curb & Driveway Repair Permit, and Sidewalk & Frontage Improvement Requirements pages before beginning applicable work.
For a basic rectangular patio, measure the finished length and width inside the forms and enter the planned thickness. If the patio is L-shaped, divide it into rectangles, calculate each section and add the volumes. If it contains a circular section, use the Round Concrete Slab Calculator.
Before placing concrete, verify grading and drainage. A material calculator cannot tell you where runoff should go or whether a patio elevation conflicts with doors, vents, weep screeds, property drainage or other building details.
For a pool-area project, use the Concrete Pool Deck Calculator. For a tapered transition, use the Concrete Wedge Calculator.
A driveway quantity estimate needs length, width and thickness. If the driveway changes width, calculate separate sections rather than using one rough dimension. Thickened edges, aprons, curb transitions or replacement panels should also be calculated separately if their geometry differs.
Do not use this page to select driveway thickness or reinforcing. Vehicle loading, base conditions, jointing, site drainage, project plans and public-works details can all matter. If the work reaches the city sidewalk, curb or street interface, confirm the applicable City of Portland requirements before demolition or placement.
For joint planning after the dimensions are known, use the Concrete Joint Spacing Calculator and Concrete Saw Cut Calculator.
Continuous footings use rectangular volume. The calculator converts footing width and depth from inches into feet, multiplies them by length and then converts the result to cubic yards.
Round piers use cylinder geometry. Their volume equals π × radius² × depth × quantity. Enter the actual diameter and depth shown on the project design rather than choosing a size from the calculator.
Diameter must be divided by two to obtain radius.
For preliminary footing geometry calculations, use the Concrete Footing Size Calculator. For reinforcing placement, see the Concrete Cover Calculator and Concrete Rebar Spacing Calculator.
Development Hub PDX is the City of Portland's online permitting system. It is used to apply for permits, pay fees, monitor permit activity and schedule inspections. Portland Permitting & Development also provides step-by-step guidance for researching a property, preparing application materials, submitting plans, responding to review comments and completing inspections.
For concrete estimating, calculate from the latest approved geometry rather than an early concept sketch. Recalculate whenever slab thickness, footing width, wall geometry, driveway dimensions, public-improvement details or grading changes during review.
Zoning permits can also matter for hardscape work. Portland's zoning-permit guidance specifically says that if permitted zoning construction includes pouring concrete or asphalt, an inspection should be requested.
Portland uses different right-of-way permit paths depending on the scope of the work. PBOT's frontage-improvement guidance says sidewalks, driveways and other frontage work may need either a Minor Improvement Permit or a Public Works Permit.
For example, the current City chart allows a Minor Improvement Permit for many sidewalk-and-curb projects of 100 feet or less, while sidewalk-and-curb work over 100 feet, ADA ramps, street paving and public retaining walls require a Public Works Permit. The technical requirements also differ: Public Works Permits can include transportation construction management and inspection, a pre-construction meeting, as-builts, punchlist, warranty and other project controls.
Use the official Sidewalk & Frontage Permit Requirements and PBOT Permit Applications pages for current permit selection.
Portland projects can involve significant rainfall, site drainage, stormwater-management requirements and sloped properties. These conditions do not change the basic concrete-volume formula, but they can change slab elevations, grading, driveway slopes, retaining-wall geometry, drainage structures and other concrete quantities.
For projects that alter site drainage or public infrastructure, use the approved civil and structural plans rather than estimating from a generic slab or footing section. Recalculate whenever grading, stormwater, retaining-wall or foundation geometry changes during review.
This Concrete Calculator in Portland can be used for projects in North Portland, Northeast Portland, Southeast Portland, Southwest Portland, the Central City and other neighborhoods within City jurisdiction. The volume formula does not change by neighborhood, but street classification, frontage standards, site slope, drainage, delivery access and permit requirements can differ.
Portland notes that some driveway and right-of-way standards depend on the street classification in the Transportation System Plan. Projects on roads managed by ODOT, Multnomah County, Washington County or another jurisdiction may have additional requirements beyond City of Portland rules.
Use this page for quantity and ordering preparation, then match the estimate to the approved plans and the agency that controls the actual project location.
Concrete prices are not hard-coded into this calculator because Portland-area ready-mix rates, haul distance, minimum-load policies, fuel charges, mix specifications, waiting time, pumping and delivery conditions can change. Enter the price per cubic yard from a current local supplier quote to calculate a simple material estimate.
The resulting cost covers only the entered cubic-yard rate. It does not automatically include labor, reinforcement, forms, base material, demolition, haul-off, pumping, line-pump setup, short-load charges, permits, inspections, finishing or curing.
For delivery logistics, use the Concrete Delivery Distance Calculator. For placement duration, use the Concrete Pour Time Calculator.
Small repairs and pads may be practical with bagged concrete. Large patios, driveways and foundation pours can require many bags, which increases handling and mixer-cycle time. The calculator provides approximate counts for 40 lb, 60 lb and 80 lb bags using typical planning yields, but the actual bag yield printed by the manufacturer should control purchasing.
If a project needs many mixer batches, use the Concrete Mixer Size Calculator to compare mixer capacity and approximate batch count. For ready-mix work, coordinate delivery rate with your crew and placement method so concrete does not arrive faster than it can be handled.
Portland concrete placement can involve dry summer conditions, frequent rain during wetter seasons, cool overnight temperatures and occasional freezing weather. Concrete planning should therefore use the actual project-date forecast rather than a seasonal average.
Use the Concrete Hot Weather Calculator during warm or dry placement conditions and the Concrete Cold Weather Calculator when low temperatures are a concern. Actual placement, protection, finishing and curing procedures should follow the ready-mix supplier, approved project specifications and applicable professional guidance.
Concrete requires a thickness dimension. Square footage alone cannot determine cubic yards.
A 4-inch slab is 0.3333 foot thick, not 4 feet.
Turn-down edges, footings, curbs and thickened strips can add significant volume beyond the main slab.
Excavation and forming can change project dimensions. Calculate from final geometry before ordering when possible.
The volume estimate does not authorize construction or determine code compliance.
| Project | Dimensions | Exact Volume | Before Extra Allowance |
|---|---|---|---|
| Small Patio | 10 × 10 ft × 4 in | 33.33 ft³ | 1.23 yd³ |
| Patio | 20 × 12 ft × 4 in | 80.00 ft³ | 2.96 yd³ |
| Walkway | 40 × 4 ft × 4 in | 53.33 ft³ | 1.98 yd³ |
| Driveway Section | 30 × 12 ft × 5 in | 150.00 ft³ | 5.56 yd³ |
| Garage Slab | 20 × 20 ft × 4 in | 133.33 ft³ | 4.94 yd³ |
These examples are mathematical references only. Calculate your actual dimensions and project thickness.
Portland uses Development Hub PDX (DevHub) as its online permitting system. Applicants can apply for building, trade, sign and zoning permits, pay fees, manage permit activity and schedule inspections online.
After a permit is issued, the City provides an inspection card listing the inspections required for the project. Residential projects can require inspections at multiple stages, and the permit is not complete until the work is approved by an inspector.
Before ordering concrete for permitted work, confirm whether a footing, foundation, reinforcing, slab or other pre-pour inspection is required. Use the latest approved dimensions so the concrete quantity matches the approved construction.
Official resources: Development Hub PDX, Portland Inspection Process, and Schedule an Inspection.
Portland Engineering publishes standard engineering details, general notes, drainage criteria and private-development plan-review resources. The City's Civil Engineering Plan Submittal Process requires site-specific civil plans to include paving and City standard detail sheets where applicable.
The City states that work and materials must comply with Portland Construction Standards and Specifications and NCTCOG Public Works Construction Standards, with Portland standards taking precedence if the two publications conflict.
For a concrete estimate, this means the quantity should be calculated from the actual section required by the approved plan or City detail—not from a generic thickness assumption.
See the official Civil Engineering Plan Submittal Process and Standard Details and Resources.
The City of Portland publishes Standard Drawings and Standard Details for public improvements. The current drawing library includes an entire P-500 through P-599 series for driveways, sidewalks, curbs and paving, including PCC pavement resurfacing, driveway connections, curb details, sidewalk details and accessible curb-ramp work.
Portland's Standard Construction Specifications apply to all public improvements and work in the City right-of-way. The City states that the specification book is a collaborative standard used by PBOT, the Bureau of Environmental Services, Portland Water Bureau and other City offices, with special provisions updated regularly when modifications are needed.
When a Portland standard drawing or approved Public Works plan applies, calculate concrete from that required geometry rather than from a generic thickness assumption.
Official references: Portland Standard Details & Drawings and Portland Construction Specifications.
Use the Concrete Volume Calculator for general geometry, the Round Concrete Slab Calculator for circular pads, and the Concrete Cubic Yard Calculator for direct yard conversions.
For reinforcing, see the Concrete Rebar Calculator, Concrete Rebar Spacing Calculator and Concrete Cover Calculator. For scheduling and logistics, use the Concrete Pour Time Calculator and Concrete Delivery Distance Calculator.
Measure final dimensions, convert them to volume, plan delivery access and verify City requirements where applicable.
Common questions about concrete yards, bags, local permits and Portland project planning.