Estimate concrete for tapered slabs, ramps, haunches, sloped strips and triangular wedge sections. Enter the finished dimensions and depths to calculate cubic feet, cubic yards, cubic meters, approximate bag counts and optional ready-mix material cost.

Tapered Volume Cubic Yards Bags & Cost
Average DepthTapered Thickness01
Concrete Volumeft³ • yd³ • m³02
Order EstimateAllowance + Bags03
Concrete Wedge Calculator: calculate a tapered concrete section by using its plan dimensions and the average of the two end depths. For a true zero-to-full triangular wedge, the average depth is one-half of the maximum depth. This tool handles those calculations automatically and converts the result into common concrete ordering units.
Select Your Wedge Type

Free Concrete Wedge Calculator — Instant Results

Choose the shape that best matches the concrete section. Results remain closed until you press Calculate.

Tapered Wedge
Different depths at each end of a rectangular plan
Most Popular
📐
Zero-to-Full
Triangular prism from zero to maximum depth
True Wedge
↗️
Slope / Rise
Base thickness plus a rise over a known run
Ramp / Slope
Multiple Wedges
Repeat the same tapered section several times
Quantity

Tapered Concrete Wedge Calculator

Calculate a rectangular wedge that changes uniformly from one depth to another.

Average DepthVolumeCost
Estimated Order Volume
0.00 yd³

Geometry

    Concrete Volume

      Bags & Cost

        📐

        Zero-to-Full Concrete Wedge Calculator

        Use for a triangular prism that starts at zero thickness and increases uniformly to a maximum depth.

        Triangular PrismHalf-Depth Average
        Estimated Order Volume
        0.00 yd³

        Geometry

          Concrete Volume

            Bags & Cost

              ↗️

              Concrete Slope & Rise Wedge Calculator

              Enter a base thickness and the vertical rise added over the run. The tool calculates the ending depth and average thickness.

              SlopeRiseAverage Thickness
              Estimated Order Volume
              0.00 yd³

              Geometry

                Concrete Volume

                  Bags & Cost

                    Multiple Concrete Wedges Calculator

                    Calculate several identical tapered sections for repeated haunches, ramps, pads or transition pieces.

                    QuantityRepeated Sections
                    Estimated Order Volume
                    0.00 yd³

                    Geometry

                      Concrete Volume

                        Bags & Cost

                          📏

                          Average Depth

                          Automatically averages the shallow and deep ends of a uniformly tapered wedge.

                          🧮

                          Multiple Units

                          See cubic feet, cubic yards and cubic meters from one calculation.

                          🧱

                          Bag Estimate

                          Planning counts for common 40, 60 and 80 lb bag sizes.

                          💲

                          Optional Cost

                          Enter a local ready-mix price per cubic yard for a material-only estimate.

                          What Is a Concrete Wedge Calculator?

                          A Concrete Wedge Calculator estimates the volume of a concrete section whose thickness changes along its length. Unlike a standard rectangular slab, a wedge is not the same depth everywhere. It may start thin and become thicker, taper from one known depth to another, or rise from zero to a full depth. Common examples include transition slabs, ramp-like placements, tapered fill, edge haunches, drainage transitions and other sloped concrete elements.

                          The key idea is simple: when the taper is uniform, the average depth is the midpoint between the starting and ending depths. The plan area is then multiplied by that average depth. This converts an awkward three-dimensional shape into an easy volume calculation without pretending the entire section is as thick as the deepest end.

                          This page is a quantity-planning tool, not a structural design tool. It does not determine the required slope, thickness, reinforcement, concrete strength, subgrade, joints, accessibility criteria, drainage or load capacity. Those project requirements should come from drawings, specifications, local rules and qualified professionals.

                          Concrete Wedge Formula

                          For a wedge with a rectangular plan that tapers uniformly from one thickness to another, first average the two depths. Then multiply the average depth by length and width.

                          Uniform Taper FormulaAverage depth = (start depth + end depth) ÷ 2
                          Volume = length × width × average depth

                          Use consistent units. If length and width are in feet, convert inches of depth to feet before multiplying.

                          For a zero-to-full wedge, the starting depth is zero. That means the average depth is simply one-half of the maximum depth. The same result can also be obtained with the triangular-prism formula: one-half × base × height × width.

                          Zero-To-Full WedgeVolume = length × width × (maximum depth ÷ 2)

                          When maximum depth is entered in inches, divide by 12 to convert it to feet before finding cubic feet.

                          How to Use the Concrete Wedge Calculator

                          1

                          Choose Shape

                          Select tapered, zero-to-full, slope/rise or multiple wedges.

                          2

                          Measure Run

                          Measure the actual finished length over which the depth changes.

                          3

                          Measure Width

                          Enter the average or constant width represented by the calculator mode.

                          4

                          Enter Depths

                          Use the shallow and deep finished concrete thicknesses.

                          5

                          Review Order

                          Check exact volume, extra allowance, bags and optional cost.

                          Example: Tapered Concrete Wedge Volume

                          Suppose a concrete transition is 12 feet long and 6 feet wide. It is 2 inches thick at the shallow end and 8 inches thick at the deep end. The average depth is (2 + 8) ÷ 2 = 5 inches, or about 0.4167 foot.

                          The plan area is 12 × 6 = 72 square feet. Multiplying 72 square feet by 0.4167 foot gives approximately 30 cubic feet. Divide by 27 and the exact theoretical volume is about 1.11 cubic yards. If you select a 10% ordering allowance, the planning quantity becomes roughly 1.22 cubic yards before any supplier-specific rounding or minimum-order rules.

                          Important: the extra-percentage setting is an ordering aid, not a universal rule. The appropriate allowance depends on measurement accuracy, excavation variation, formwork, subgrade, spillage, placement method and supplier practices.

                          Where a Concrete Wedge Calculation Is Useful

                          Tapered slabs and transitions

                          A slab may transition from one elevation or thickness to another. When the change is linear and the plan width stays constant, averaging the two depths gives the correct volume for the tapered portion.

                          Ramps and sloped concrete sections

                          Some ramp-like placements contain a constant base thickness plus an additional wedge created by a rise. The Slope / Rise calculator mode combines those two components by treating the ending thickness as base thickness plus rise.

                          Haunches and thickened edges

                          Local thickening can sometimes be represented as a wedge or as a rectangular portion plus a triangular portion. If the geometry is more complex, divide it into simple solids, calculate each separately, and add the volumes.

                          Drainage and grading transitions

                          Concrete surfaces often need planned elevations for drainage. The calculator can estimate the material quantity after the elevations and concrete thicknesses have already been established by the project design.

                          Repeated wedge sections

                          For identical repeated elements, use Multiple Wedges rather than manually multiplying every result. The quantity input multiplies the exact volume before the ordering allowance is applied.

                          Concrete Wedge Volume Conversion

                          UnitRelationshipUseful For
                          Cubic foot (ft³)12 × 12 × 12 inchesSmall volume calculations and bag yield
                          Cubic yard (yd³)27 cubic feetReady-mix concrete ordering
                          Cubic meter (m³)About 35.315 cubic feetMetric specifications and comparison
                          Average depth(Depth 1 + Depth 2) ÷ 2Uniform tapered wedge calculation
                          Zero-to-full averageMaximum depth ÷ 2Triangular wedge calculation

                          Concrete Wedge Measurement Figure

                          Measure the run, width and both finished depths. A uniform taper uses the average of the shallow and deep ends.

                          Length / RunStart depthEnd depthAverage depth drives volume
                          RunHorizontal finished length of the taper.
                          WidthPlan width perpendicular to the run.
                          Start DepthFinished thickness at the shallow end.
                          End DepthFinished thickness at the deep end.

                          Concrete Wedge vs Rectangular Slab

                          Rectangular slab

                          A standard slab has one consistent thickness. Its volume is simply length × width × thickness. If the slab is 6 inches thick everywhere, every square foot of plan area uses the same concrete depth.

                          Tapered wedge

                          A wedge changes thickness. Using only the deepest measurement would overstate volume, while using only the shallowest measurement would understate it. A uniform linear taper uses the average depth.

                          How Much Extra Concrete Should I Order for a Wedge?

                          The mathematical wedge volume represents ideal geometry. Real work may contain irregular excavation, subgrade variation, imperfect forms, uneven edges, spillage or dimensions that differ slightly from the plan. For that reason, contractors often plan some additional material. This calculator lets you compare 0%, 5%, 10% and 15% rather than imposing one fixed percentage.

                          Do not treat the selected allowance as a guarantee. Ready-mix suppliers may have order increments, truck-capacity limits, short-load fees or minimum quantities. Before placing an order, verify the required quantity with the supplier and compare the calculator result with the actual field measurements.

                          Bagged Concrete for Small Wedges

                          Small wedges, patches and transitions may be mixed from bags instead of delivered by a ready-mix truck. The calculator provides approximate counts for 40, 60 and 80 lb bags using simple planning yields. These are not manufacturer-specific promises. Actual yield varies by product, mix consistency and handling.

                          Always use the yield printed on the bag you plan to buy. Divide the required cubic feet, including any chosen allowance, by the manufacturer's stated yield per bag, then round up to a whole bag. For larger wedge placements, the labor required to mix many bags can become significant, so compare bagged material with ready-mix delivery.

                          Common Concrete Wedge Calculator Mistakes

                          Using maximum depth for the entire area

                          This is the most common wedge error. If a section changes from 2 inches to 8 inches and you multiply the whole plan area by 8 inches, you are calculating a full rectangular prism rather than a taper.

                          Forgetting to convert inches to feet

                          If length and width are entered in feet, thickness in inches must be divided by 12. The calculator handles this conversion automatically.

                          Measuring slope surface instead of horizontal run

                          The formulas on this page use plan length or horizontal run. A sloped surface length can be slightly longer. Use the dimensions that match the geometric model and project drawings.

                          Mixing structural design with volume math

                          Knowing the volume does not establish a safe thickness, reinforcement plan, ramp slope, bearing capacity or accessibility compliance. Those are design questions, not quantity conversions.

                          Ignoring nonuniform width

                          If the wedge widens or narrows as well as changes depth, one simple length × width × average-depth model may not accurately represent it. Divide the shape into smaller sections with reasonably uniform geometry.

                          Planning a Concrete Wedge Pour

                          Before concrete arrives, confirm forms, elevations, access, reinforcement or embedded items, placement equipment, finishing tools and curing materials. A tapered placement can be more sensitive to elevation control than a simple flat slab because the intended geometry depends on both the shallow and deep endpoints.

                          Mark the required elevations or use the control method specified for the project. Concrete placement and finishing are time-sensitive, and the shallow end of a wedge may behave differently from a deeper mass. Follow the project documents and concrete supplier recommendations for mixture selection, placement and curing.

                          Quantity calculator only: this page does not choose minimum concrete thicknesses, reinforcement, joints, slopes, curing procedures or safe construction details.

                          Related Concrete Calculators

                          Use related tools when your project contains more than one geometric shape. A wedge may be only one part of a larger slab, ramp, footing or concrete placement.

                          External Concrete Planning Resources

                          For requirements beyond simple volume math, consult the project specifications and qualified professionals. The American Concrete Institute publishes concrete codes, standards and educational resources. For construction-worker safety topics, including silica exposure during concrete cutting and grinding, see the OSHA construction silica resources.

                          How to Measure a Concrete Wedge Accurately

                          Good concrete quantity estimates begin with finished dimensions rather than rough visual guesses. Measure the horizontal run from the point where the taper begins to the point where it reaches the ending thickness. Then measure the width represented by that section. If the width changes substantially, split the project into two or more smaller wedges instead of forcing one average width into the calculation.

                          Measure both endpoint depths from the finished concrete surface to the bottom of the concrete section. If the subgrade slopes or steps independently of the top surface, a simple wedge may not capture the real shape. In that situation, break the section into rectangular and triangular components, or take several cross-section measurements and calculate each segment separately.

                          Use field dimensions after excavation and forming

                          Plan dimensions are useful for budgeting, but formed dimensions are often better for a final order. Small differences in excavation depth can materially change volume when the wedge is wide or long. Check the shallow end, deep end and intermediate elevations before ordering ready-mix.

                          Keep units consistent

                          The calculator accepts length and width in feet and depths in inches. It converts the depth to feet internally. If you calculate manually, do not multiply feet by inches without converting the depth first.

                          Understanding Wedge Slope, Rise and Average Thickness

                          The calculator also reports a simple depth-change slope percentage. It compares the change in concrete thickness with the horizontal run. For example, if thickness increases by 6 inches over a 12-foot run, the depth change is 0.5 foot over 12 feet, or about 4.17%. This number describes the geometry of the concrete thickness change; it is not automatically the same as the finished-surface grade, accessibility slope or drainage slope.

                          Average thickness is different from maximum thickness. For a 2-inch to 8-inch uniform taper, the average is 5 inches. For a zero-to-8-inch triangular wedge, the average is 4 inches. That distinction is why a wedge calculator can prevent significant over-ordering compared with treating the whole area as if it were the deepest thickness.

                          Depth changeEnd depth minus start depth. This shows how much the concrete section thickens or thins over the run.
                          Average thicknessThe midpoint of two endpoint depths when the taper is linear. This value drives theoretical volume.
                          Slope percentageVertical depth change divided by horizontal run, multiplied by 100. Use it only as a geometric reference.

                          Irregular Concrete Wedges and Complex Shapes

                          Not every tapered pour is a perfect triangular prism. Some sections curve, change width, contain steps, include thickened edges or transition between several elevations. The most reliable way to estimate these projects is usually to divide them into simpler shapes. Calculate a rectangular base separately, calculate each tapered wedge separately, and add the volumes together.

                          For a long wedge with changing width, divide the run into stations. Measure the width and depth at each station and create smaller segments. More segments generally produce a better approximation of curved or irregular geometry. For high-value or tolerance-sensitive work, use the quantity takeoff method specified by the project team rather than relying on a generic online calculator.

                          If the wedge surrounds pipes, drains, pits or other voids, subtract only voids that materially reduce the concrete quantity and whose dimensions are known. Small embedded items usually do not justify complicated deductions, while large blockouts can.

                          Concrete Wedge Cost Planning

                          Concrete material cost is only one part of a wedge placement. Entering a ready-mix price per cubic yard gives a quick material-only estimate based on the selected ordering quantity. Actual invoices may include delivery charges, minimum-load or short-load fees, environmental charges, fuel surcharges, waiting time, Saturday or after-hours charges, pumping and other local costs.

                          Labor can also vary because tapered placements may require closer elevation control and more forming than a uniform slab. Site access, wheelbarrow distance, pump setup, reinforcement, surface finish and curing requirements can all affect total installed cost. Use the cost result as a starting point for budgeting, then obtain supplier and contractor quotes for the real project.

                          For small bagged-concrete wedges, compare the cost per yielded cubic foot rather than only the price per bag. A larger bag may cost more but yield more concrete. Always use the manufacturer's actual stated yield and follow its mixing instructions.

                          Before Ordering Concrete for a Tapered Section

                          • Verify the finished length, width, start depth and end depth.
                          • Confirm whether the taper is actually linear between the two endpoints.
                          • Check forms, subgrade and elevations after preparation.
                          • Confirm reinforcement, embeds and joints from the project documents.
                          • Decide whether the project needs ready-mix delivery or bagged material.
                          • Ask the supplier about order increments, minimum loads and delivery access.
                          • Plan how the concrete will move from the truck or mixer to the wedge.
                          • Have placement, screeding, finishing and curing equipment ready before the pour.

                          Concrete quantity is easiest to adjust before the truck is dispatched. A few minutes spent checking the wedge geometry can reduce the risk of a short load or a large leftover quantity.

                          Concrete Wedge Calculator FAQs

                          Answers to common questions about tapered concrete volume and ordering.

                          For a uniform taper, average the starting and ending depths, convert the average depth to feet, then multiply by length and width. Divide cubic feet by 27 to get cubic yards.
                          A zero-to-full wedge has an average depth equal to half of its maximum depth. Multiply length by width by that half-depth.
                          You can use it for volume when the ramp or sloped section can be represented by a uniform wedge. It does not determine whether the ramp slope, thickness or reinforcement is appropriate.
                          Yes. You can select 0%, 5%, 10% or 15% extra. The correct planning allowance depends on site conditions, measurement accuracy and supplier practices.
                          Yes. The results include approximate 40, 60 and 80 lb bag counts. Verify the actual yield printed by the bag manufacturer before purchasing.
                          Yes. Choose Multiple Wedges, enter the dimensions of one wedge and the number of identical sections.
                          No. The tool calculates quantity only. Required thickness, reinforcement, slope, joints, concrete strength and other design details must come from project requirements and qualified guidance.
                          When thickness changes linearly from one end to the other, the average of the two endpoint depths represents the mean thickness across the length. Multiplying plan area by this average gives the wedge volume.