Use the Concrete Calculator in McAllen to estimate concrete for slabs, patios, driveways, parking pads, footings, piers and multi-section pours. Get cubic feet, cubic yards, bag quantity, ordering allowance and optional ready-mix material cost.

✓ 4 Working Calculators ✓ Yards + Bags ✓ Local Cost Input ✓ PDF Result
🌉
McAllen Project PreviewMeasure → calculate → order
Ready
McAllen, Texas Enter finished dimensions Cubic yards + bags + cost
Volumeyd³
BagsCount
OutputPDF
Use your current supplier quoteCheck McAllen permit requirements
Slab & PatioLength × Width × Thickness01
Driveway & ApronMain Slab + Approach02
Footing & PierSquare / Round Bases03
Multiple SectionsComplex Layouts04
Concrete Calculator in McAllen, TX: Estimate concrete for patios, slabs, driveways, parking pads, footings, piers and multi-section pours in McAllen. Enter finished dimensions, choose an ordering allowance, add the actual bag yield if you are using bagged mix, and optionally enter a current McAllen ready-mix quote per cubic yard. The calculator handles the material arithmetic; structural thickness, reinforcement, drainage, flood-zone requirements, public-right-of-way details and permit status must be confirmed separately for the individual project.
Select Your McAllen Concrete Project

Free Concrete Calculator in McAllen — Cubic Yards, Bags & Cost

Choose the project geometry that best matches the finished concrete.

▰
Slab & Patio
Rectangular slab, patio, walkway section, shed pad or equipment pad.
⭐ Most Popular
🚗
Driveway & Apron
Main driveway plus a separate apron, widened entrance or approach section.
McAllen Driveway
⬜
Footing & Pier
Square pad or round footing/pier volume using approved dimensions.
Foundation Work
➕
Multiple Sections
Combine up to three rectangular sections with different thicknesses.
Irregular Layout
▰

McAllen Concrete Slab & Patio Calculator

Estimate a rectangular patio, slab, walkway section, pad or similar flatwork project.

Square FeetCubic YardsBag Count

Use the thickness required by your plan or project requirements.

Enter the actual product yield.

Optional: enter a current supplier quote.

Enter positive length, width, thickness and bag yield. Allowance must be 0–50%.
Concrete To Order
0.00 yd³

Project Geometry

    Concrete Volume

      McAllen Order Estimate

        McAllen planning note: The quantity is based on the thickness you enter. This calculator does not determine whether the project needs a building permit, engineering, reinforcement, drainage details, base preparation or a different slab thickness.

        Verify actual formed dimensions, project requirements and supplier ordering increments before purchasing concrete.

        🚗

        McAllen Concrete Driveway & Apron Calculator

        Calculate a private driveway slab plus a separate apron, flare or approach area.

        DrivewayApronCombined Volume
        Enter positive driveway/apron dimensions and bag yield. Allowance must be 0–50%.
        Combined Concrete To Order
        0.00 yd³

        Main Driveway

          Apron / Approach

            Total Order

              McAllen permit note: City guidance states that installing, widening, eliminating or repairing a driveway, or cutting into curb, gutter or sidewalk, can require zoning approval followed by a Curb, Gutter, Sidewalk permit process through local road authority. Confirm the current requirements for your exact project before work begins.

              Quantity estimate only. It does not approve driveway access geometry, right-of-way construction or permit status.

              ⬜

              McAllen Concrete Footing & Pier Volume Calculator

              Estimate concrete for approved square-pad or round footing/pier dimensions.

              SquareRoundMultiple Units
              Enter positive footing size, depth, quantity and bag yield. Allowance must be 0–50%.
              Concrete To Order
              0.00 yd³

              Footing Geometry

                Concrete Volume

                  Ordering Estimate

                    Structural note: This mode calculates material from entered dimensions. It does not size a footing from loads, soil bearing, settlement, seismic demand or code requirements. Use approved dimensions for structural work.

                    Material quantity is not structural design.

                    ➕

                    McAllen Multiple-Section Concrete Calculator

                    Add up to three rectangular sections with different dimensions and thicknesses.

                    3 SectionsDifferent DepthsCombined Cost
                    Section 1 must be complete. Optional sections must be fully entered or left at zero. Allowance must be 0–50%.
                    Combined Concrete To Order
                    0.00 yd³

                    Section Areas

                      Exact Concrete

                        McAllen Order Estimate

                          Layout note: Divide L-shaped, widened or phased pours into non-overlapping sections. Curved or triangular pieces should be calculated from their own geometry when they are significant.

                          Avoid overlapping sections or the same concrete area will be counted more than once.

                          Concrete Calculator in McAllen: Estimate Concrete From Real Dimensions

                          A Concrete Calculator in McAllen should begin with the dimensions of the concrete you actually intend to place. That sounds simple, but many quantity mistakes happen because estimators use excavation width, property dimensions, a rough sketch or a generic “typical” quantity instead of the finished concrete geometry. This page keeps the math transparent: measure the shape, enter the required thickness, calculate exact volume and then choose an appropriate ordering allowance.

                          The same basic volume formulas work across McAllen neighborhoods, but project requirements do not. A backyard patio, driveway approach, structural footing, garage slab and sidewalk repair can fall under different construction and permitting rules. For that reason, the calculator handles quantity while linking to current McAllen resources for permit and right-of-way questions.

                          The page also avoids hard-coding a local ready-mix price. Concrete prices can change with supplier, mixture specification, order size, delivery zone, fuel, short-load policy and access. Enter your current McAllen quote if you want a simple concrete-material budget.

                          How to Calculate Concrete Yards in McAllen

                          For a rectangular slab, multiply length by width to get square feet. Convert concrete thickness from inches to feet by dividing by 12, then multiply the area by thickness to get cubic feet. One cubic yard contains 27 cubic feet, so divide by 27 for cubic yards.

                          McAllen Concrete Volume Formula Cubic feet = Length (ft) × Width (ft) × [Thickness (in) ÷ 12]

                          Cubic yards = cubic feet ÷ 27. Order estimate = exact cubic yards × (1 + allowance percentage).

                          Suppose an McAllen patio is 20 ft long by 12 ft wide and the approved thickness is 4 inches. The area is 240 ft². Four inches equals one-third of a foot, so the exact volume is 80 ft³. Divide 80 by 27 and the result is about 2.96 yd³. Add 10% in the calculator and the planning order becomes about 3.26 yd³.

                          Use final form dimensions whenever possible. Rechecking after base preparation can catch meaningful differences between the design sketch and the concrete that will actually be placed.

                          McAllen Concrete Calculator for Slabs and Patios

                          Patios, walkways, equipment pads, small shop slabs and other flatwork can usually be estimated as rectangles or a collection of rectangles. Measure the inside distance between forms, not the total excavated area. Excavation often extends beyond the concrete edge to make room for base preparation and forming.

                          If the project changes thickness, split it into separate areas. For example, a patio slab may be one thickness while a thickened edge, equipment pad or stair landing is deeper. Increasing the whole slab thickness to compensate for a small deep area can overstate the order.

                          The Slab & Patio calculator displays gross square feet, exact cubic feet, exact cubic yards, allowance-adjusted order volume, estimated bags and optional material cost. For garage-specific planning, see the Concrete Garage Floor Calculator.

                          Concrete Driveway Calculator in McAllen

                          A McAllen driveway can include a private slab, parking extension, garage transition, widened apron or approach. The Driveway & Apron calculator keeps the main driveway and transition area separate, which is useful when their widths or thicknesses differ.

                          Driveway access, curb, sidewalk, drainage and right-of-way requirements are separate from concrete quantity. The City of McAllen maintains an online permit portal where users can search building permits, planning cases and property information. For work that changes access or public infrastructure, confirm the applicable City process before forming or ordering concrete.

                          Measure the finished concrete area rather than the full excavation. If the apron is tapered, use an average width only when the geometry is reasonably uniform, or divide it into smaller shapes for better accuracy.

                          McAllen driveway reminder: A cubic-yard result does not approve driveway width, curb cuts, drainage, sidewalk transitions or work in the public right-of-way. Check the current City requirements for the exact property.

                          McAllen Building Permits and Concrete Projects

                          The City of McAllen operates an official Online Permit Portal for building permits, other permits, planning cases and property information. The portal currently states that the City’s 2018 building codes became effective January 1, 2021 and provides contact information for the Building Permits and Inspections Department.

                          That does not mean every standalone slab or repair needs the same permit. Permit status depends on the scope, use, structure and location. A structural footing, addition, garage foundation, commercial slab or work tied to a building can involve different review than a small nonstructural flatwork project.

                          Use the calculator for quantity, then use the City of McAllen Online Permit Portal to search permit information or property records and confirm requirements with the City when needed.

                          McAllen Footing and Pier Concrete Calculator

                          Footing concrete should be calculated from approved dimensions. The Footing & Pier mode supports either a square pad or a round cylinder. A square footing uses side × side × depth. A round footing uses π × radius² × depth. Multiply one-unit volume by the number of identical footings.

                          This calculator intentionally does not determine required footing size. McAllen structural projects can be influenced by building loads, soil conditions, seismic design, reinforcement, nearby slopes, retaining conditions and other factors that cannot be reduced to a universal internet dimension.

                          For preliminary bearing-area concepts, see the Concrete Foundation Size Calculator. For deck support, see the Concrete Deck Footing Calculator. Final structural dimensions should come from the applicable prescriptive provision or approved design.

                          How Much Extra Concrete Should You Order?

                          An ordering allowance gives room for modest differences between theoretical and field volume. Base elevation may vary slightly, forms can move, hand excavations are not perfectly smooth and some concrete remains in placement equipment. The correct allowance depends on the project rather than the city name.

                          A carefully formed slab on a uniform prepared base may need less contingency than hand-dug footings, irregular demolition replacement or a complex driveway transition. The calculator lets you choose your own percentage. Measure accurately first and use allowance second.

                          Supplier ordering increments also matter. If the calculator produces 6.37 yd³, the actual order may be rounded according to the supplier’s accepted increment and your project conditions. Confirm that policy before delivery.

                          McAllen Ready-Mix Concrete Cost Calculator

                          The cost field intentionally starts at zero. Enter a current ready-mix quote per cubic yard from the supplier serving your project. The calculator multiplies that rate by the selected order volume, including your allowance.

                          The result is not an installed concrete price. A complete project budget may include demolition, excavation, haul-off, grading, base rock, compaction, forms, reinforcement, dowels, anchors, vapor retarder, pumping, labor, finishing, curing, saw cutting, sealer, traffic control and permit fees.

                          Concrete material

                          Use the current quoted cubic-yard rate for the actual mixture.

                          Delivery & placement

                          Add short-load, fuel, pump, waiting-time or difficult-access charges separately.

                          Site construction

                          Budget base, forms, reinforcement, labor, finishing and curing outside the material calculation.

                          Concrete Bags for Small McAllen Projects

                          Bagged concrete can be useful for fence posts, isolated footing pads, small landings, patch areas and other low-volume work. The bag calculator uses the yield you enter because bag weight alone does not tell you the exact cured volume. Different products and package sizes can have different yields.

                          If a project needs 12 ft³ after allowance and the selected mix yields 0.60 ft³ per bag, the calculation is 12 ÷ 0.60 = 20 bags. If the yield is 0.45 ft³ per bag, the same project requires about 27 whole bags.

                          For larger slabs and driveways, compare bagged-concrete labor with ready-mix delivery. Hundreds of bags can create a difficult placement sequence and increase batching variability.

                          How to Measure Irregular McAllen Concrete Work

                          McAllen properties can include rural lots, clay or sandy soils, older homes, additions, farm structures, urban and residential sites and renovation work that produce irregular concrete layouts. The safest estimating method is to split the project into simple non-overlapping shapes. An L-shaped patio can become two rectangles. A widened parking area can become several rectangles. A triangular taper can be calculated separately as one-half × base × height × thickness.

                          The Multiple Sections calculator supports three rectangles and lets each section have its own thickness. If you have more sections, calculate them in groups and add the exact volumes before applying one final allowance.

                          For other geometric shapes, use related tools. The Concrete Arch Calculator handles circular arch rings, and the Concrete Cone Calculator handles cones and frustums.

                          Concrete Thickness: Use the Project Requirement

                          Thickness has a direct effect on cubic yards. A 5-inch slab contains 25% more concrete than a 4-inch slab of the same area. That makes thickness one of the most important values in the calculator.

                          Do not allow the quantity calculator to choose thickness by project label. A “driveway” can serve passenger vehicles, delivery trucks or other loads. A “patio” can be ground-supported or part of a more complex structure. Enter the thickness shown on approved plans or required by the project.

                          If a pour includes multiple thicknesses, keep them separate. This improves both material accuracy and communication with the crew.

                          Hot-Weather Concrete Planning in McAllen

                          McAllen projects frequently require careful hot-weather planning. The concrete quantity itself is still based on geometry, but high ambient temperatures, direct sun, warm forms and warm aggregate can accelerate slump loss and surface drying. Placement, finishing and curing plans should reflect the actual forecast, concrete mixture and project specification.

                          Do not compensate for workability loss by adding unapproved water at the jobsite. Coordinate the concrete mixture, delivery timing, crew size and placement method so the load can be discharged and finished within the required limits. For exposed slabs and driveways, curing protection should be ready before concrete arrives.

                          Sudden storms can also disrupt flatwork. If rain is possible, plan covers and runoff control before placement and use the Concrete Rain Pour Calculator as an additional planning aid.

                          McAllen Concrete Projects Through the Year

                          Concrete can be placed throughout the year in the Rio Grande Valley, but the construction plan should adapt to temperature, wind, sun and rain. Summer work may benefit from early starts, coordinated truck spacing and rapid curing protection. Cooler periods can reduce evaporation but still require normal attention to finishing and curing.

                          The calculator does not change cubic yards by season because the physical volume of the slab or footing remains the same. Seasonal conditions belong in the placement, labor, protection and scheduling plan rather than inside the geometry formula.

                          Base Preparation, Drainage and McAllen Site Conditions

                          A volume calculation assumes the concrete depth is reasonably consistent. Poorly graded base creates low spots that consume extra concrete and high spots that reduce slab thickness. Verify the prepared base before finalizing the order.

                          Drainage can also influence slab elevation and grading. Surface slope usually does not change quantity much when thickness is consistent, but wedges, ramps, transitions and depressed drain zones can. Measure those areas from the actual detail.

                          On sloped or retaining situations, concrete quantity is only part of the problem. Stability, foundation design, drainage and structural requirements may require professional evaluation.

                          McAllen Drainage and Flood-Zone Planning

                          Drainage and finished elevation can affect the geometry of driveways, patios, slabs and site concrete. A volume calculator cannot decide the correct site elevation or drainage path. Resolve those issues first so the entered thickness represents the intended finished concrete rather than uncontrolled low spots.

                          The City of McAllen GIS platform includes FEMA flood-zone and drainage-project mapping among its available resources. Use those tools for preliminary research and confirm any project-specific floodplain, drainage or elevation requirements through the applicable City process.

                          For material estimating, calculate depressed areas, ramps or drainage transitions separately when their thickness differs materially from the main slab.

                          Rebar and Reinforcement for McAllen Concrete

                          Reinforcement should be estimated from approved details rather than inferred from concrete square footage. Rebar size, spacing, cover, lap length and supports can vary significantly by slab, footing, wall or other structural element.

                          Once reinforcement is known, use the Concrete Rebar Calculator for bar quantity. Keeping reinforcement and concrete volume as separate calculations makes it easier to revise the project if the geometry or bar layout changes.

                          Concrete Mix, Strength and Water-Cement Ratio

                          Volume tells you how much concrete is required, not what mixture should be supplied. Specified compressive strength, exposure, aggregate, slump, air content, admixtures and water-cement ratio are separate requirements.

                          For ready-mix structural work, provide the supplier with the required mixture specification. For small non-structural batch planning, the Concrete Mix Ratio Calculator can compare component proportions, but a nominal ratio should not replace an approved structural mixture.

                          McAllen Driveway, Sidewalk, Drainage and Right-of-Way Planning

                          Concrete near a street can involve more than the private slab. Driveway approaches, sidewalks, drainage, utilities and public right-of-way geometry may be controlled by City standards or approved development plans. Resolve those dimensions before using the calculator for a final order.

                          The City of McAllen GIS site provides development, zoning, engineering, drainage and FEMA flood-zone mapping resources. These maps are useful for preliminary property research, but they do not replace a project-specific permit or engineering determination.

                          When a driveway or slab connects to public infrastructure, calculate the private and public portions separately if they are governed by different details. This makes it easier to track quantities and supplier tickets.

                          Public Infrastructure and Roadside Concrete in McAllen

                          Concrete associated with sidewalks, drainage, utility structures, roadway improvements or other public infrastructure should be estimated from approved engineering or development drawings. The volume formulas are still geometric, but reinforcement, mixture requirements, testing, traffic control, inspections and construction sequencing can be different from private residential flatwork.

                          Keep public-work quantities separate from private slabs when possible. This improves material tracking and reduces the chance of applying one thickness or specification across areas that actually have different requirements.

                          Concrete Pour Planning in McAllen

                          Before scheduling concrete, verify the forms, reinforcement, embedded items, access, crew, finishing equipment and curing method. On rural, wooded, soft-ground, urban, commercial or tight residential sites, mixer-truck access and staging can be a major part of the plan. A pump, buggy or long chute may be needed even when the concrete volume itself is straightforward.

                          Check weather near pour day and plan for sun, wind or rain conditions that could affect placement and finishing. If rain is possible, use the Concrete Rain Pour Calculator as a planning aid.

                          If concrete must be placed near pedestrian or vehicle traffic, verify whether traffic-control or encroachment requirements apply to the operation.

                          Worked Example: McAllen Patio

                          Suppose a backyard slab is 18 ft × 14 ft at 4 inches thick. Surface area is 252 ft². Multiply by 4 ÷ 12 and the exact concrete volume is 84 ft³. Divide by 27 and the result is approximately 3.11 yd³.

                          A 10% allowance raises the planning quantity to about 3.42 yd³. If the chosen bagged product yields 0.60 ft³ per bag, that quantity represents about 154 bags. For a project of that size, it is worth comparing bag labor with a ready-mix quote.

                          Worked Example: McAllen Driveway and Apron

                          Assume a private driveway is 35 ft × 12 ft at 4 inches thick and the approach area is 5 ft × 16 ft at 5 inches thick. The main slab contains approximately 5.19 yd³ and the apron contains approximately 1.23 yd³. Combined exact volume is about 6.42 yd³.

                          At a 10% allowance, the calculator returns approximately 7.06 yd³. Enter a current McAllen supplier price per cubic yard to produce a simple material estimate. If the apron or driveway work reaches a public right-of-way, review the applicable town, city or road-authority process separately.

                          Common Concrete Calculator Mistakes in McAllen

                          Using excavation dimensions

                          The excavation can be wider or deeper than the finished concrete. Use the actual concrete shape.

                          Forgetting inch-to-foot conversion

                          Four inches is 0.333 ft, not 0.4 ft. The calculator handles the conversion automatically.

                          Ignoring an apron or widened section

                          A driveway approach can add substantial volume, especially when it is thicker than the main slab.

                          Guessing the concrete price

                          Use a current supplier quote instead of relying on an old local price article.

                          Assuming permit exemption means no other approval

                          Building-permit exemptions do not automatically remove zoning, transportation or public-right-of-way requirements.

                          Using one thickness for every section

                          Calculate different depths separately.

                          Ordering from a preliminary sketch

                          Recheck dimensions after forms and base preparation whenever possible.

                          Concrete Replacement and Demolition Quantity in McAllen

                          When an existing slab or driveway is being replaced, estimate the new concrete from the finished replacement dimensions rather than the volume of demolished debris. Broken concrete expands into irregular pieces, so demolition haul-off volume is a different calculation from the compact volume of the new pour. A 4-inch slab removed from the site does not occupy the same loose volume in a truck or debris box that it occupied as a solid slab.

                          For replacement work, measure the area after deciding whether the new slab will match the old footprint. Repairs to settlement, drainage or alignment can change the finished dimensions. If the replacement includes a new thickened edge, widened parking area or revised driveway approach, calculate each new component separately.

                          Existing demolition can also reveal base problems that were not visible during the initial estimate. Soft zones, abandoned utility trenches or deep patches may require correction before forms are reset. Recheck the concrete depth after base repairs instead of ordering only from the old slab thickness.

                          If the project is a localized patch instead of full replacement, use the Concrete Repair Calculator to estimate patch volume. Keeping repair work separate from full-depth replacement makes both the material estimate and project scope easier to understand.

                          Estimating Concrete on Sloped McAllen Properties

                          A sloped site can make a simple-looking concrete project more difficult to measure. The most important quantity question is whether the concrete maintains a consistent thickness along the slope or forms a wedge with one edge deeper than the other. A uniformly thick slab can still be estimated from surface dimensions and thickness, while a true wedge requires average-depth or prism geometry.

                          For a rectangular wedge whose thickness changes uniformly from one edge to the opposite edge, a useful quantity method is to multiply plan area by the average of the two concrete depths. For example, if one side is 4 inches thick and the opposite side is 8 inches thick, the average depth is 6 inches when the change is linear across the slab. This method should only be used when the actual geometry really is a uniform wedge.

                          Uniform Wedge ApproximationVolume = Length × Width × [(Depth 1 + Depth 2) ÷ 2]

                          Convert the average depth to feet before multiplying by plan area.

                          Do not use extra concrete as a substitute for proper grading or retaining design. If a project on a slope needs retaining walls, grade beams, stepped footings or engineered support, calculate those structural components from their approved dimensions. The general Concrete Wall Calculator and Concrete Strip Calculator can help with material quantity after the structural geometry is known.

                          How to Compare McAllen Concrete Supplier Quotes

                          Two ready-mix quotes can look different even when the headline price per cubic yard is similar. Before comparing totals, confirm that each quote refers to the same concrete mixture, order quantity and delivery assumptions. A lower cubic-yard price may be offset by short-load fees, fuel surcharges, minimum quantities or additional charges for waiting time and special placement conditions.

                          Use the calculator to create one consistent order quantity first. Then ask each supplier to price that same quantity and specified mix. This gives you a cleaner comparison than using a different rounded quantity for every quote. If the supplier requires ordering in a particular increment, update the final purchase quantity after the mathematical estimate is complete.

                          Also consider placement logistics. A supplier quote for concrete delivered to the curb is not the same as an installed price at forms behind a building or down a steep access path. Pumping, buggies, extra labor or traffic-control needs can be separate from the ready-mix invoice. The calculator’s cost output is intentionally limited to concrete material so those project-specific items remain visible instead of being hidden inside an unexplained rate.

                          McAllen Concrete and Permit References

                          For local permit research, the City of McAllen’s official Online Permit Portal allows users to search building permits, planning cases and property information. The portal also publishes the Building Permits and Inspections Department contact information and notes that the City’s 2018 building codes became effective January 1, 2021.

                          For mapping and development context, the City’s GIS platform includes zoning, development, engineering, drainage and FEMA flood-zone resources. For general residential concrete practice, the American Concrete Institute publishes ACI PRC-332.1-18 Guide to Residential Concrete Construction.

                          McAllen Concrete Measurement Figure

                          Measure each finished concrete shape separately, then combine the exact volumes before adding your selected ordering allowance.

                          McAllen Concrete Project Measurement Guide Width Length SLAB / PATIO PRIVATE DRIVE APRON / APPROACH DRIVEWAY Side Depth SQUARE FOOTING Diameter ROUND PIER Concrete Order = Exact Shape Volume + Chosen Allowance Use current McAllen supplier pricing and verify applicable City permit, drainage or right-of-way requirements.
                          FlatworkLength × width × thickness for slabs and patios.
                          DrivewaysCalculate the private slab and approach separately when dimensions differ.
                          FootingsUse approved square or round dimensions.
                          McAllen OrderApply your allowance and current supplier price after geometry is verified.

                          Concrete Calculator in McAllen FAQs

                          Common questions about concrete yards, bags, driveway quantities, cost and McAllen project planning.

                          Multiply length by width by thickness using consistent units to get cubic feet, then divide by 27 for cubic yards. The calculator converts inches of thickness to feet automatically.
                          Yes. Enter the actual bag yield and the calculator divides the ordering volume by that yield and rounds up to a whole bag.
                          Yes. Enter a current supplier price per cubic yard. The result is a concrete-material estimate and does not include delivery extras, labor or site work.
                          No. Pricing can change by supplier, mixture, order size and delivery conditions, so the user enters a current quote.
                          Yes. The Driveway & Apron mode has separate dimensions and thickness inputs for the private driveway and approach area.
                          Requirements depend on the exact work and location. Check the City of McAllen permit process when changing a driveway approach, sidewalk, drainage feature or public-right-of-way area.
                          No. It calculates material from dimensions you enter. Structural footing size and reinforcement must come from applicable project requirements.
                          There is no universal percentage for every project. Choose an allowance based on base uniformity, form accuracy, excavation conditions and your estimating practice.
                          Yes. Divide the shape into non-overlapping rectangles and use the Multiple Sections calculator. Calculate significant curves or triangles separately.