Concrete Strip Calculator | Strip Footing Cubic Yards, Bags & Cost
Free Strip Footing Concrete Estimator

Estimate Continuous Footing & Trench Concrete

Concrete Strip Calculator

Use the Concrete Strip Calculator to estimate cubic feet, cubic yards, concrete bags and material cost for continuous strip footings, wall foundations, trench pours and multiple footing runs.

✓ 4 Working Calculators✓ yd³ + ft³✓ Bags + Cost✓ PDF Result
📐
Strip Footing PreviewLength × Width × Depth
Ready
Measure total footing run lengthUse finished concrete width & depthContinuous strip below wall line
Outputyd³ + ft³
OrderAllowance
PDFIncluded
Quantity planning for strip concreteStructural sizing must follow plans/code
Straight StripSingle Run01
Multiple RunsCombined Length02
Stepped StripDifferent Sections03
Bagged MixWhole Bags04
Concrete Strip Calculator: Enter the finished length, width and depth of the concrete strip—not just the excavation size. Choose an ordering allowance and optional local price to estimate cubic yards and cost. For small strip footings, enter the manufacturer’s bag yield to estimate whole concrete bags. This calculator estimates material quantity only; footing width, depth, reinforcement, bearing and frost requirements must come from the applicable plans, code or qualified designer.
Select Your Strip Calculation

Free Concrete Strip Calculator — Volume, Bags & Cost

Choose one strip geometry below, enter the finished concrete dimensions and calculate the quantity to plan.

📏
Straight Strip
One continuous footing or trench with a constant width and depth.
⭐ Most Popular
➕
Multiple Runs
Combine up to four footing runs that share the same cross-section.
Combined Length
🪜
Stepped Strip
Add three sections with different lengths, widths or depths.
Variable Sections
🧱
Bagged Concrete
Convert a strip footing volume into whole bags using product yield.
DIY Mix
📏

Straight Concrete Strip Calculator

Best for one strip footing, foundation run, grade trench or narrow continuous pour with a constant cross-section.

LengthWidthDepth
Enter valid positive dimensions, quantity and allowance between 0% and 50%.
Estimated Concrete To Order
0.00 yd³

Geometry

    Volume

      Order & Cost

        Planning quantity only. Confirm the structural footing dimensions, supplier ordering increments and actual excavation before placing an order.

        Material estimate only; not a footing design or code-compliance calculation.

        ➕

        Multiple Strip Runs Calculator

        Add several wall or footing runs that use the same strip width and depth.

        4 RunsShared SectionTotal Length
        Enter at least one positive run length plus valid width, depth, allowance and price.
        Estimated Combined Concrete To Order
        0.00 yd³

        Runs

          Volume

            Order & Cost

              Use this option only when every run has the same concrete width and depth. Use the Stepped Strip calculator when sections differ.

              Material estimate only; verify drawings and field dimensions.

              🪜

              Stepped / Variable Strip Calculator

              Calculate up to three strip sections separately when length, width or depth changes.

              Section ASection BSection C
              Enter valid positive dimensions for each used section and an allowance between 0% and 50%.
              Estimated Stepped Strip Concrete To Order
              0.00 yd³

              Sections

                Exact Volume

                  Order & Cost

                    For sloping or irregular footings, divide the concrete into measurable sections that represent the actual geometry shown on the plan.

                    Material estimate only; stepped footing geometry must follow the construction documents.

                    🧱

                    Bagged Concrete Strip Calculator

                    Estimate whole bags for a small strip footing using the actual cubic-foot yield printed on the product.

                    Bag YieldWhole BagsCost

                    Check the actual bag label.

                    Enter valid positive dimensions, product yield, price and allowance.
                    Estimated Bags Required
                    0 bags

                    Geometry

                      Volume

                        Bag Order

                          Bag weights alone do not determine yield. Use the published yield of the exact concrete mix you plan to buy.

                          Rounded to whole bags. Check manufacturer yield and project suitability before purchase.

                          What Is a Concrete Strip Calculator?

                          A Concrete Strip Calculator estimates the volume of concrete needed for a long, narrow rectangular pour such as a continuous strip footing beneath a wall, a trench foundation, a garden wall base, a perimeter footing or another linear concrete element. Instead of estimating only floor area, it uses three dimensions: the length of the run, the width of the concrete strip and its depth. That produces a cubic volume, which can then be converted into cubic yards for ready-mix ordering or divided by product yield for bagged concrete.

                          Strip footings are common because they distribute wall loads continuously along a foundation line. The quantity calculation is simple once the required dimensions are known, but choosing those dimensions is a structural and code question. Soil bearing capacity, wall load, frost depth, footing projection, reinforcement, drainage and local construction rules may all influence the required footing. This page therefore treats the dimensions you enter as already selected by your plan, designer or applicable prescriptive requirements.

                          Use the straight-strip option when the entire footing has the same cross-section. Use Multiple Runs when several separate walls use the same width and depth. Use Stepped Strip when the footing changes size or elevation and can be represented as separate rectangular sections. For a small DIY footing, the bagged option converts the volume into a whole-package count.

                          Quantity versus design: the calculator can tell you how many cubic yards fit a 16-inch-wide by 8-inch-deep strip, but it cannot determine whether 16 × 8 inches is adequate for your structure. Always separate material estimating from structural design.
                          📏

                          Linear Footing Volume

                          Convert a long strip length and rectangular cross-section into cubic feet and cubic yards.

                          ➕

                          Multiple Runs

                          Add wall lines that share the same width and depth without doing separate calculations.

                          🧱

                          Bag Estimate

                          Use the product’s real cubic-foot yield to estimate whole bags for smaller jobs.

                          📄

                          PDF Result

                          Download the calculated quantity and project details for purchasing or site notes.

                          Concrete Strip Footing Formula

                          When the strip is rectangular and the length is measured in feet while width and depth are measured in inches, convert both cross-section dimensions to feet before multiplying.

                          Concrete Strip FormulaCubic feet = Length (ft) × [Width (in) ÷ 12] × [Depth (in) ÷ 12]

                          Cubic yards = cubic feet ÷ 27. Ordering quantity = exact volume × (1 + allowance ÷ 100).

                          For example, a 40-foot strip that is 16 inches wide and 8 inches deep contains about 35.56 cubic feet, or approximately 1.32 cubic yards before any allowance. Adding a 10% ordering allowance produces about 1.45 cubic yards. A supplier may require the final order to be rounded to its own increments, and small loads may be subject to short-load charges.

                          Why two inch-to-foot conversions are necessary

                          A common estimating error is to divide only the depth by 12 while leaving the strip width as an inch value. If length is in feet, both width and depth must be expressed in feet before multiplication. The calculator handles these unit conversions automatically, reducing a frequent source of twelve-times or 144-times errors.

                          Linear feet are not cubic feet

                          A contractor may describe a footing as “80 linear feet,” but that number alone does not describe concrete quantity. Eighty linear feet of a 12 × 6 inch strip uses much less concrete than 80 linear feet of a 24 × 12 inch strip. The cross-sectional area is what turns linear footage into volume.

                          How to Measure a Concrete Strip Correctly

                          1

                          Read the Plan

                          Confirm the required footing width, depth and any changes in section.

                          2

                          Measure Runs

                          Add the centerline or actual concrete run lengths shown for each wall line.

                          3

                          Check Corners

                          Make sure shared corners are not accidentally counted twice in your length total.

                          4

                          Inspect Trench

                          Compare excavated depth and width with the intended finished concrete geometry.

                          5

                          Add Allowance

                          Choose a realistic buffer and confirm supplier ordering increments.

                          Use the finished concrete dimensions

                          If forms define the strip, measure the internal dimensions of the formwork. If concrete is placed directly against earth, the trench itself may define the final width and depth, but over-excavation can increase the actual quantity. Loose trench sides, bell-outs, soft spots and local deep areas can all consume more concrete than a perfect rectangular model predicts.

                          Separate sections that change size

                          If a footing is 16 inches wide for one wall and 24 inches wide beneath a heavier section, do not average the widths unless the drawings intentionally define an equivalent shape. Calculate each segment separately and add the volumes. The Stepped Strip tool is designed for exactly that workflow.

                          Measure after excavation when practical

                          Early estimates are useful for budgeting, but a final quantity check after excavation and before the pour can reveal conditions that the plan-based estimate missed. If the trench has grown wider because soil sloughed off, or if low spots require additional depth, update the volume before ordering.

                          Concrete Strip Calculator for Footings, Walls and Trenches

                          Project TypeTypical GeometryBest CalculatorKey Quantity Check
                          Continuous wall footingLong rectangular stripStraight StripWidth and depth from plans
                          Perimeter foundationSeveral connected runsMultiple RunsAvoid double-counting corners
                          Stepped foundationSections vary by width/depthStepped StripCalculate each section separately
                          Garden wall footingNarrow continuous stripStraight or BaggedUse local design requirements
                          Small trench pourConcrete placed in excavationStraight StripField trench may exceed plan size
                          DIY short footingSmall rectangular volumeBagged ConcreteManufacturer yield per bag

                          These categories describe estimating geometry rather than structural suitability. A foundation supporting a residence, retaining wall or heavily loaded structure may require engineering, while a small nonstructural garden project may be governed by simpler local requirements. Always use the dimensions that apply to your specific project.

                          How the Multiple Strip Runs Calculator Works

                          Many foundation layouts consist of four exterior walls plus one or more interior bearing lines. When every footing uses the same width and depth, the easiest quantity method is to total the run lengths and multiply that combined length by one cross-sectional area. The Multiple Runs calculator lets you enter up to four lengths, including zero for unused rows, then performs that calculation automatically.

                          Be careful at intersections. If your field measurement method already includes the full outside perimeter, adding each wall dimension independently can double-count portions at corners depending on how the dimensions were taken. A clean takeoff should use one consistent convention—plan centerlines, clear runs, or explicit footing lengths—so each physical piece of concrete is represented once.

                          Interior bearing strips

                          An interior footing may be wider or deeper than the exterior strip. If its section differs, do not include it in the shared-width multiple-run calculation. Put it into the Stepped Strip calculator as a separate section, or calculate it independently and add the result to the project total.

                          Openings do not always remove footing length

                          A door opening in a wall does not automatically mean the footing below it disappears. Continuous footings commonly remain continuous beneath wall openings, but the project drawings control. Estimate the concrete shown on the foundation plan rather than subtracting every architectural opening.

                          Stepped Strip Footings and Unequal Sections

                          Sloping sites can require foundations to step vertically. Footings may also change width or depth under concentrated loads, chimneys, returns or transitions. A single average width and depth can obscure these changes, so the safer quantity approach is to split the concrete into rectangular segments that match the construction drawing.

                          For each segment, calculate length × width × depth, convert the result into cubic feet and then add all section volumes. Only after the sections are combined should you apply an overall ordering allowance, unless the project specifically requires different allowances for different pours.

                          Steps themselves can add small volumes

                          A simple three-section calculator represents each segment as a rectangular prism. Real stepped foundations may include overlaps, keyways, thickened transitions or geometry that cannot be captured by three simple boxes. For complex work, use a detailed takeoff from the structural drawings. The calculator is best treated as a fast estimator rather than a substitute for a professional quantity survey.

                          How Much Concrete Does a Strip Footing Need?

                          The answer depends entirely on its length and cross-section. A 50-foot footing that is 12 inches wide and 6 inches deep contains 25 cubic feet, or about 0.93 cubic yard. The same 50-foot length at 24 inches wide and 12 inches deep contains 100 cubic feet, or about 3.70 cubic yards—four times as much concrete. This illustrates why a “price per linear foot” or “yards per 100 feet” shortcut can be misleading unless width and depth are fixed.

                          If you know the concrete volume per linear foot, you can use it as a quick check. The volume per foot equals width in feet × depth in feet. For a 16-inch × 8-inch strip, each linear foot contains about 0.889 cubic foot. Multiplying that by total run length should match the calculator’s exact cubic-foot result before allowance.

                          Example: 60 ft × 18 in × 8 in

                          Convert 18 inches to 1.5 feet and 8 inches to 0.667 foot. Multiply 60 × 1.5 × 0.667 to get approximately 60 cubic feet. Divide by 27 to obtain about 2.22 cubic yards exact. With a 10% allowance, the planning quantity is about 2.44 cubic yards before supplier rounding.

                          Ready-Mix vs Bagged Concrete for Strip Footings

                          Ready-Mix Concrete

                          Ready-mix delivery is often practical when a footing contains enough volume that hand mixing would create a long, labor-intensive placement.

                          • Ordered in cubic yards
                          • Fast placement for continuous footings
                          • May require truck, pump, buggy or chute access
                          • Minimum-load or short-load charges may apply
                          • Site, forms and reinforcement must be ready when the truck arrives

                          Bagged Concrete

                          Bagged mixes can suit short strips, isolated repairs or remote locations where ready-mix access is impractical.

                          • Purchased in whole bags
                          • Easy to transport in smaller quantities
                          • Mixing consistency and placement speed matter
                          • Large bag counts create substantial labor
                          • Actual product yield should drive the estimate

                          Do not choose bagged concrete solely because the raw material price appears lower. Include mixer capacity, water supply, labor, placement time and the need to keep a footing placement continuous. Conversely, a very small footing may be uneconomical for a truck delivery after minimum-order charges.

                          Concrete Bag Calculation for a Strip

                          To estimate bags, first calculate the ordering volume in cubic feet, including the chosen allowance. Divide that number by the published yield per bag and round up. For example, if a short strip needs 7.2 cubic feet with allowance and the selected product yields 0.60 cubic foot per bag, the estimate is 12 bags.

                          Bagged Strip FormulaBags = Ordering volume (ft³) ÷ Product yield (ft³ per bag), rounded up

                          The bag’s nominal weight is not enough by itself. Use the yield printed on the specific concrete mix.

                          Different formulations, aggregate sizes and package weights can have different yields. The calculator therefore asks for yield rather than assuming that every 60 lb or 80 lb product produces the same volume. This keeps the estimator compatible with many brands and metric or specialty products once their cubic-foot equivalent is known.

                          Ordering Allowance: How Much Extra Concrete Should You Add?

                          A theoretical strip calculation assumes perfect dimensions. Actual excavations and forms can vary. An ordering allowance provides a planning buffer for small over-width areas, uneven trench bottoms, spillage and measurement uncertainty. The calculator allows a percentage between 0% and 50% so you can see how the buffer affects quantity.

                          There is no universal percentage that is correct for every footing. A precisely formed strip on a prepared base may need less contingency than an earth-formed trench in unstable soil. The purpose of an allowance is not to replace measurement. If the trench is visibly much wider than the plan, measure the actual condition instead of applying a large arbitrary percentage to an outdated estimate.

                          Supplier rounding

                          Your calculated result may be 2.44 yd³ while the supplier accepts orders only in certain increments. The quantity to purchase can therefore differ from the mathematical result. Ask how the supplier rounds, whether a minimum load applies and what happens to excess concrete. Plan a safe location for small leftovers rather than improvising after the truck arrives.

                          Strip Footing Width, Depth and Reinforcement

                          The most important limitation of any online concrete strip calculator is that it cannot design the footing. Width and depth are not selected by volume mathematics. They can depend on building loads, soil capacity, frost conditions, wall material, eccentricity, nearby excavations, reinforcement and local building requirements. Structural footings can also be governed by flexure and shear design.

                          The American Concrete Institute’s residential concrete guidance includes separate treatment of footing purpose, footing types, design considerations and construction, and it notes that applicable codes and construction documents take precedence over general guidance. That is a useful boundary for this calculator: use the drawings or accepted design requirements to establish the geometry, then use this page to estimate the concrete that geometry consumes.

                          Reinforcement volume is usually not deducted

                          For ordinary estimating, the volume displaced by reinforcing steel is typically small relative to the footing volume and is not deducted from the concrete quantity. Reinforcement quantity itself should be estimated separately from the bar schedule or design. Use the Concrete Rebar Calculator if your project specifies reinforcing bars and you need a separate material takeoff.

                          Excavation, Forms and Trench Conditions

                          Some strip footings are poured into forms; others are poured directly into excavated trenches where permitted. The estimating implications are different. Formed work tends to provide a more controlled cross-section, while earth-formed trenches can widen as soil breaks away. Wet or loose soil can make dimensions less predictable and may require corrective preparation before concrete placement.

                          If the trench is intended to act as the form, take several width and depth readings along the run. A single measurement at the neatest location can understate the average volume. Where the plan requires a clean bearing surface or specific footing elevation, follow the project specification for excavation, dewatering and subgrade preparation.

                          Do not pour over loose material

                          The calculator assumes the entered depth represents concrete, not a mixture of concrete and loose spoil. Remove loose soil, debris and standing water as required by the construction documents and accepted site practice. If over-excavation occurs, the designer or inspector may need to determine the correct remedy rather than simply filling every void without review.

                          Concrete Strip Cost Estimate

                          The calculator’s ready-mix cost is intentionally simple: ordering cubic yards multiplied by the price per cubic yard that you enter. This is a material estimate, not an installed footing price. It does not automatically include delivery, short-load fees, pumping, labor, excavation, forms, reinforcement, inspections, testing, curing, taxes or disposal of excess material.

                          For bagged concrete, estimated cost is whole bags multiplied by your entered price per bag. If the project requires many bags, compare that result with a local ready-mix quote and the labor needed to mix continuously. A cheaper material unit can become more expensive when equipment, time and crew size are included.

                          Typical additional footing costs

                          • Layout and excavation
                          • Soil correction, stone base or dewatering where required
                          • Forms, stakes and bracing
                          • Reinforcing steel, chairs and ties
                          • Ready-mix delivery or concrete pump
                          • Labor for placement and consolidation
                          • Curing and weather protection
                          • Inspection, permits or engineering when applicable

                          Common Concrete Strip Estimating Mistakes

                          Using trench length only

                          Linear footage is not enough. Always include the strip width and concrete depth.

                          Mixing feet and inches without conversion

                          Both width and depth must be converted to feet when length is entered in feet. The calculator performs this automatically.

                          Double-counting corners

                          Perimeter footings can be overstated when each wall length is added independently and overlapping corner sections are included twice. Use one consistent takeoff method.

                          Using the wrong depth

                          Excavation depth from grade is not always the same as concrete footing thickness. A trench may include granular base, a stem wall or other foundation components. Enter only the actual concrete strip depth being calculated.

                          Subtracting wall openings without checking the plan

                          Continuous footings may run beneath door and window openings. Quantity should follow the foundation plan, not the architectural opening schedule alone.

                          Ignoring field over-excavation

                          An earth-formed footing may consume more concrete than the drawing’s perfect rectangle if the trench sides break away. Recheck actual dimensions before ordering.

                          Assuming the calculator chooses a safe footing size

                          The calculator accepts whatever geometry you enter. That does not mean the geometry is structurally adequate.

                          Concrete Strip Planning Checklist

                          Foundation plan checked

                          Confirm footing width, depth, steps and any thickened locations.

                          All run lengths measured

                          Use one consistent convention and avoid duplicate corners.

                          Excavation inspected

                          Look for widening, loose sides, water and local deep spots.

                          Reinforcement coordinated

                          Place bars, dowels and supports according to the drawings.

                          Delivery access planned

                          Confirm truck, pump, buggy or wheelbarrow route before ordering.

                          Weather and curing ready

                          Have protection and curing materials available before placement.

                          Related Concrete Calculators

                          Use the main Concrete Calculator for slabs, columns and other shapes. If your strip includes reinforcing steel, use the Concrete Rebar Calculator. For general placement logistics, see the Concrete Pour Calculator, and if weather may affect placement, review the Concrete Rain Pour Calculator. Small damaged footing areas can also be estimated with the Concrete Repair Calculator.

                          For broader technical guidance, the American Concrete Institute’s ACI 332.1R-18 Guide to Residential Concrete Construction includes chapters addressing footings, concrete materials, placement and other residential concrete topics. Applicable codes, drawings and project specifications should control your actual foundation design.

                          Sources and Technical References

                          External references support general education about footing construction and foundation systems. They do not replace the project’s adopted code, design drawings or professional advice.

                          Concrete Strip Footing Measurement Figure

                          Measure the continuous run length, finished strip width and concrete depth. Keep excavation depth and wall height separate unless they are actually part of the concrete strip being estimated.

                          STRIP WIDTHDEPTHRUN LENGTH — MEASURE ALONG FOUNDATION LINECONCRETE STRIP FOOTING
                          Run LengthTotal continuous footing length in feet.
                          Strip WidthFinished concrete width from plan or field condition.
                          Strip DepthActual concrete thickness, not total excavation depth.
                          AllowanceAdd only after checking actual dimensions.

                          Concrete Strip Calculator FAQs

                          Common questions about strip footing volume, cubic yards, bags, measurement and ordering.

                          Multiply the footing length by its finished width and depth using consistent units. Convert cubic feet to cubic yards by dividing by 27, then add any chosen ordering allowance.
                          The exact rectangular volume is about 35.56 cubic feet, or roughly 1.32 cubic yards before adding an ordering allowance.
                          Yes. Use Multiple Runs when every run shares the same width and depth. Enter each run length and the calculator combines them.
                          Divide the footing into rectangular sections that match the different lengths, widths and depths. Calculate each section separately and add the volumes.
                          Use the depth of concrete actually being placed in the strip. Excavation depth may include base material, wall height or other foundation components that are not part of the footing volume.
                          No. The correct footing dimensions depend on structural loads, soil, frost conditions and applicable code or design requirements. The calculator only estimates quantity from dimensions you enter.
                          Calculate the ordering volume in cubic feet, divide it by the manufacturer’s stated yield per bag and round up to a whole bag.
                          For ordinary quantity estimating, reinforcing steel displacement is usually small and is generally not deducted. Estimate reinforcement separately from the project design.
                          Yes. Calculate a result first, then select Download Result PDF inside the visible result panel.
                          No. Ready-mix cost uses only the cubic-yard price you enter, while bagged cost uses bag price. Delivery, pumping, labor, forms, excavation and reinforcement are separate.