Learn how to order ready-mix concrete without guessing. This step-by-step guide covers quantity, extra concrete, PSI and slump, delivery scheduling, truck spacing, pump coordination, site access, delivery tickets, water adjustments, short loads and the questions to ask your ready-mix supplier before pour day.

✓ Guide Page✓ Supplier Checklist✓ Mobile Friendly
Ordering ready-mix is more than calling for “a truck of concrete.” NRMCA and ASCC's ordering checklist includes the project/location, quantity, required date and start time, truck spacing, placement rate, mix code, strength, slump and air content, plus policies for short loads, returned concrete, changes and after-hours orders. A good order coordinates the product and the delivery plan before the first truck leaves the plant.
📐

Measure the Pour

Calculate cubic yards from the actual forms and include a stated contingency for waste and irregularities.

🧪

Specify the Mix

Order the strength, slump, air and admixture requirements from the plans, specification or qualified professional.

🚚

Schedule the Trucks

Match truck spacing to the placement rate so the crew and concrete supply stay synchronized.

🏗️

Prepare the Site

Confirm access, pump setup, crew, forms, reinforcement, washout and weather plan before dispatch.

How to Order Ready-Mix Concrete in 8 Steps

1

Calculate cubic yards

Measure the actual forms, not just the drawing. Include thickened edges, footings, grade beams and irregular areas.

2

Add contingency

Allow for waste, over-excavation, uneven subgrade, form deflection and small measurement differences.

3

Confirm mix requirements

Have the project mix code or required PSI, slump, air and admixture requirements available.

4

Choose placement method

Tell the supplier whether trucks discharge by chute, pump, conveyor, buggy or another method.

5

Schedule date & start

Reserve the delivery window and learn the supplier's confirmation, change and cancellation policy.

6

Set truck spacing

Estimate how many cubic yards per hour the crew can place so dispatch can plan the interval between loads.

7

Prepare access & crew

Make sure trucks can enter, turn, discharge and leave safely and that the crew is ready before the first load arrives.

8

Check every ticket

Verify the delivered mix and document any jobsite adjustments before concrete is placed.

Step 1: Calculate How Much Ready-Mix Concrete You Need

Ready-mix concrete is normally ordered by volume—cubic yards in the United States or cubic meters in metric markets. For a rectangular slab, multiply length by width by thickness. If dimensions are in feet, thickness must also be converted to feet before calculating cubic feet. Divide cubic feet by 27 to get cubic yards.

Rectangular Slab FormulaCubic Yards = Length(ft) × Width(ft) × Thickness(ft) ÷ 27

For inches of thickness: Thickness(ft) = Thickness(in) ÷ 12.

Do not forget sections that are thicker than the nominal slab. Turn-down edges, grade beams, footings, post holes, steps, curbs and irregular excavations can add meaningful volume. Recheck the forms on site after excavation and before placing the order.

If you want a dedicated quantity tool, use the Concrete Slab Calculator, Square Concrete Calculator or Concrete Meter to Yard Calculator before calling the supplier.

How Much Area Does One Cubic Yard of Concrete Cover?

One cubic yard contains 27 cubic feet. The square-foot coverage depends entirely on thickness. These are mathematical coverage values before waste, thickened edges or irregular subgrade.

ThicknessThickness in Feet1 yd³ CoversTypical Planning Context
3 in0.25 ft108 sq ftPatios / light flatwork only where appropriate
4 in0.333 ft81 sq ftCommon residential slab planning example
5 in0.417 ft64.8 sq ftHeavier flatwork where specified
6 in0.50 ft54 sq ftDriveways / structural flatwork where specified
8 in0.667 ft40.5 sq ftThicker slabs and structural applications
12 in1.00 ft27 sq ftFootings / thick sections
Do not choose slab thickness from this table. Thickness should come from the project design, code requirement, engineer, contractor or appropriate local practice for the load and soil conditions.

Step 2: Add Extra Concrete for Waste and Real-World Conditions

Ordering the exact theoretical volume leaves no room for field conditions. NRMCA CIP 8 identifies waste, over-excavation, spreading forms, irregular subgrade, settlement and other factors that can make the placed concrete appear short. Its guidance recommends estimating these contingencies and ordering roughly 4% to 10% more than the original volume calculation.

Consumer guidance sometimes recommends a larger 10%–15% cushion because homeowner measurements and subgrades can be less predictable. A repetitive commercial placement with well-controlled forms may need less contingency than a one-off backyard project with irregular excavation.

Contingency FormulaOrder Quantity = Calculated Volume × (1 + Contingency %)

Example: 8.0 yd³ × 1.08 = 8.64 yd³ with an 8% allowance.

Round and order according to the producer's accepted increments. Ask whether partial-yard quantities are allowed and how the supplier handles final cleanup loads.

Step 3: Know What Concrete Mix to Order

If the project has drawings or specifications, order the concrete required by those documents. The ready-mix supplier may identify the product by a mix code rather than by a long verbal description. For a small non-engineered project, explain the application and local exposure conditions to a qualified supplier or contractor, but do not guess at structural requirements.

Strength & durability information

  • Required compressive strength (PSI or MPa)
  • Air-entrainment requirement if applicable
  • Maximum water-cementitious ratio if specified
  • Exposure or durability requirements
  • Fiber, corrosion or specialty admixtures

Workability & placement information

  • Required slump or slump range
  • Pump, chute or other placement method
  • Aggregate size where specified
  • Accelerator or retarder requirements
  • Color, integral pigment or decorative mix needs

Cemex's current direct-ordering workflow similarly asks customers to select the mix and choose from available slump and PSI strength options before scheduling delivery. That is a useful reminder that the product specification and delivery schedule are separate parts of the order.

What Is Concrete Slump When Ordering?

Slump describes the consistency and workability of fresh concrete. A higher slump generally means the concrete is more fluid, but the correct slump should be achieved through the approved mix design and admixtures—not by casually adding excess water at the jobsite.

Tell the supplier the required slump from the mix design or project specification. If you are pumping concrete, tell both the ready-mix producer and pump company before the pour because pumpability can influence aggregate size, workability and mix selection.

Avoid ordering “extra wet.” Ask for the workability required for the placement method and specification. Excess water can change the water-cementitious ratio and concrete properties.

Step 4: Tell the Supplier How the Concrete Will Be Placed

Ready-mix trucks cannot always discharge directly into every form. The supplier should know whether you are using a standard rear-discharge chute, front-discharge truck, line pump, boom pump, conveyor, buggy or crane bucket. Placement method affects delivery timing and may affect the recommended mix.

Direct chute Line pump Boom pump Concrete buggy Conveyor Crane bucket

If pumping, coordinate the pump and ready-mix schedules. The pump should be set up and ready before the first truck arrives. Confirm who supplies priming material, where trucks stage, how drivers will approach the hopper and where concrete washout will occur.

Step 5: Schedule the Delivery Date and Start Time

Concrete is a perishable product and ready-mix dispatch is a coordinated fleet operation. NRMCA's ordering checklist specifically calls out advance notice, will-call confirmation, add-on orders, change orders, cancellations, after-hours placements and weekend or holiday charges. Clarify those policies when placing the order—not after the first truck is already scheduled.

Give the supplier the exact project address and a reliable jobsite contact number. If GPS routing is misleading, provide gate, entrance or route instructions. Tell dispatch about road restrictions, narrow streets, steep grades or other access concerns.

Step 6: Set Truck Spacing and Placement Rate

NRMCA/ASCC's checklist asks for both truck spacing/duration and placement rate in cubic yards per hour. These are critical because too many trucks can create a queue of aging concrete, while too much spacing leaves the crew waiting and can create cold joints or finishing problems.

Estimate the crew's realistic production rate. A small hand-placed backyard slab may move much slower than a pump-fed commercial slab with a large crew. Do not schedule trucks based on the fastest five minutes of the job; use a sustainable placement rate.

Simple Truck Spacing ConceptTruck Interval ≈ Load Size ÷ Placement Rate

Example: if a load is 9 yd³ and the crew can place 18 yd³/hour, the average interval is about 30 minutes. Actual dispatch must account for haul time and producer logistics.

Ready-Mix Ordering Flow

A simple visual sequence from measurement to delivery. All labels remain contained inside the figure on desktop and mobile.

Measure → Specify → Schedule → Receive 1. Measure Calculate yd³ Add contingency Recheck forms 2. Specify PSI / mix code Slump / air Placement method 3. Schedule Date / start time Truck spacing Jobsite contact 4. Receive Check ticket Verify mix Document changes Good ordering coordinates the concrete and the entire placement plan
QuantityMeasured cubic yards
MixSpecified properties
ScheduleTruck spacing & rate
DeliveryTicket & adjustments

Ready-Mix Concrete Order Checklist

Use this checklist before calling dispatch. It follows the same categories emphasized in the NRMCA/ASCC ordering and scheduling checklist while keeping the language practical for homeowners, small contractors and project managers.

Order ItemWhat to Have ReadyWhy It Matters
Project & contactJob name, address, purchaser, ordered-by contact, phonePrevents dispatch confusion and gives driver a jobsite contact
QuantityTotal cubic yards plus planned contingencyReady-mix is sold by fresh concrete volume
Date & start timeRequested delivery date, start time and confirmation policyCoordinates plant, trucks and crew
Truck spacingMinutes between trucks or desired cubic yards per hourMatches supply to placement speed
Mix requirementMix code, PSI, slump, air, aggregate, admixtures or specEnsures the delivered product matches the project
Placement methodChute, pump, conveyor, buggy or crane bucketAffects workability and delivery coordination
Site accessTruck route, gate width, ground condition, washout locationAvoids unsafe or impossible access on pour day
Fees & policiesShort load, returned concrete, waiting, after-hours, weekend, cancellationPrevents surprise charges

A Simple Script for Calling a Ready-Mix Supplier

Instead of starting with “How much is a truck of concrete?”, give dispatch the information needed to price and schedule the job correctly.

Example: “I need ready-mix for a residential slab at [job address]. My calculated quantity is 8.2 cubic yards and I am planning to order 8.8 yards including contingency. The project calls for [mix code / PSI], [slump], and [air requirement if applicable]. We are placing by [chute / pump] and expect to place about [X] yards per hour. I would like to start at [time] on [date]. Please tell me your minimum load, short-load policy, delivery charge, waiting-time policy, available truck spacing, cancellation deadline, and anything else you need from me.”

Step 7: Prepare the Jobsite Before the Truck Arrives

The order is not ready simply because the supplier has it in the dispatch system. Concrete delivery should not begin until the site and crew are ready to receive it.

Placement readiness

  • Forms complete, braced and checked
  • Subgrade/base compacted and at final elevation
  • Reinforcement, embeds and vapor barrier complete
  • Inspection complete where required
  • Pump or placement equipment set up
  • Screeds, floats, vibrators and finishing tools ready

Delivery readiness

  • Truck access route is safe and firm
  • Overhead wires and low branches checked
  • Gate widths and turning area confirmed
  • Washout location arranged
  • Jobsite contact available by phone
  • Weather protection and curing materials ready

Never direct a heavy concrete truck onto questionable soil, septic systems, underground utilities or unsupported pavement. The driver and supplier may refuse unsafe access, and that is preferable to damaging the site or creating a safety incident.

Step 8: Check the Ready-Mix Delivery Ticket

NRMCA quality guidance emphasizes that ready-mix delivered to a jobsite should be identifiable and traceable, and its ordering checklist is built around documenting the requested quantity, timing and mix details. Review the delivery ticket before discharge and compare it with the order.

Depending on the supplier and specification, the ticket may identify the plant, truck, quantity, batch time, mix code and material or admixture information. If testing is required, coordinate the testing agency so samples are taken correctly and without delaying placement.

Keep the tickets. They create a project record of what was delivered and can be useful if questions arise about the mix, batch time, water additions, quantity or testing.

Can Water Be Added to Ready-Mix Concrete at the Jobsite?

Do not automatically add water just because concrete seems difficult to place. NRMCA's current concrete-materials FAQ explains that ASTM C94 allows jobsite water addition only when the slump is below what is required and the total mixing-water content allowed by the mix design is not exceeded. NRMCA also recommends documenting purchaser-requested additions on the delivery ticket.

NRMCA further notes that adjustments with water or admixtures should be followed by adequate mixing revolutions so the added material is incorporated uniformly. If you need more workability, discuss the acceptable adjustment with the producer rather than making an undocumented change.

How to Avoid Short Loads and Last-Minute Concrete Orders

NRMCA CIP 8 recommends reevaluating the volume needed toward the end of a placement and notifying the producer early enough to adjust the final two or three loads. This is much better than waiting until the crew discovers a shortage after the scheduled trucks are finished.

Measure actual progress

Track how much of the slab or forms have been filled compared with the volume delivered.

Update dispatch early

Tell the supplier whether the final load should be increased, reduced or cancelled according to policy.

Avoid excess return

Returned concrete has economic and environmental consequences, so do not wildly over-order just to feel safe.

Ready-Mix Truck Capacity: Do Not Assume Every Truck Holds 10 Yards

“A concrete truck is 10 yards” is a common rule of thumb, but truck capacity and legal loading vary by equipment, producer and jurisdiction. NRMCA notes that producers generally load trucks at or near their rated mixer capacity, and central mixing equipment can also vary significantly in capacity.

For ordering purposes, you do not need to guess the truck size. Give dispatch the total quantity and placement rate; the producer will split the order into appropriate loads. Ask about the expected size of the first loads and final cleanup load if truck count matters for access, staging or pump scheduling.

Weather Planning When Ordering Ready-Mix Concrete

Weather can affect placement rate, slump loss, setting time and finishing. Hot weather can shorten working time, while cold weather can require additional protection or different mix practices. Rain can disrupt site access, subgrade preparation and surface finishing.

Discuss hot- or cold-weather requirements with the supplier and contractor in advance. Do not wait for the first truck to ask whether a retarder, accelerator, chilled water or other adjustment should have been part of the mix design.

If the forecast makes the placement unsafe or likely to produce poor-quality work, follow the supplier and contractor's cancellation or rescheduling policy early enough to avoid unnecessary fees.

Ready-Mix Concrete Ordering Mistakes to Avoid

  • Ordering theoretical volume only: no allowance for waste, subgrade irregularity or field variation.
  • Guessing the mix: strength and durability requirements should come from the project requirements.
  • Ignoring truck spacing: good quantity with bad timing can still ruin a placement.
  • Not mentioning a pump: pumping should be coordinated before dispatch.
  • Letting trucks arrive before the site is ready: this can create waiting charges and quality problems.
  • Adding uncontrolled water: jobsite adjustments should stay within permitted limits and be documented.
  • Forgetting short-load policy: the final small load may be disproportionately expensive.
  • No cleanup/washout plan: trucks need an approved place for chute rinse or residual material according to local/site rules.
  • Throwing away tickets: keep delivery records for every load.

Related Concrete Guides and Calculators

Authoritative Ready-Mix Ordering Sources

This guide is based on current industry guidance and practical supplier ordering workflows. For project specifications or contractual requirements, follow the applicable plans, standards and producer instructions.

Guide disclaimer: ready-mix producers have different order increments, truck capacities, mix codes, lead times, fees and delivery policies. Confirm every order directly with the supplier serving your project.

How to Order Ready-Mix Concrete FAQs

Common questions about quantity, mix requirements, truck spacing, delivery tickets, water, short loads and pour-day coordination.

Have the project address, required cubic yards, requested delivery date and start time, truck spacing or placement rate, mix or specification, compressive strength, slump, air requirements, admixtures, placement method and jobsite contact information ready.
NRMCA CIP 8 recommends allowing roughly 4% to 10% above the original calculated volume for waste, over-excavation and other contingencies. Irregular or uncertain work may need more.
Lead time varies by producer, season and project size. NRMCA's ordering checklist specifically identifies advance notice, order confirmation, changes and cancellations as items to clarify with the supplier. Call early and confirm again according to the producer's policy.
Use the strength required by your plans, engineer, code or project specification. Do not choose PSI only by price. If the project is not engineered, ask the ready-mix producer or qualified contractor what mix is commonly used for that application in your area.
Slump is a measure of fresh concrete consistency and workability. The correct slump depends on placement method, reinforcement, mix design and specifications. Give the supplier the required slump or mix code instead of asking for 'extra wet' concrete.
NRMCA states that ASTM C94 permits jobsite water addition only within defined limits when slump is below requirement and the total mixing-water limit is not exceeded. Purchaser-requested additions should be documented on the delivery ticket.
Truck capacity varies by producer, equipment and local load restrictions. Do not assume every truck carries the same amount. Tell dispatch the total quantity and planned placement rate so they can schedule suitable loads.
Truck spacing is the planned time interval between loads. It should match how quickly the crew can place and finish concrete so trucks do not stack up waiting or leave the crew waiting for the next load.
A short-load charge is an additional fee for a small load or a final cleanup load below the producer's normal economical quantity. NRMCA's ordering checklist specifically recommends clarifying extra charges for short loads and returned concrete.
A cleanup load is a smaller final load used to finish a placement after the exact remaining quantity is reevaluated. NRMCA recommends updating the producer near the end of the pour so the last loads can be adjusted and unnecessary short loads can be avoided.
Use a pump when the truck cannot discharge directly where concrete is needed or when placement speed and access make pumping more practical. Tell the ready-mix supplier in advance because pumping can affect the mix and delivery plan.
Check the project/load identification, mix code or ordered specification, quantity, batch time and other required information. NRMCA guidance emphasizes delivery-ticket traceability and documentation of any jobsite water or admixture adjustments.
Concrete is perishable, and delays can create waiting charges and quality or workability problems. Have forms, reinforcement, access, crew, tools, pump and testing arrangements ready before dispatch.
Sometimes, but change-order and add-on policies vary by supplier. NRMCA's ordering checklist recommends clarifying advance notice, add-on orders, change orders, cancellations and after-hours charges before placement day.
A common failure is treating the order as only a quantity. Successful ordering also coordinates mix requirements, delivery timing, truck spacing, site access, placement rate, crew readiness, weather and contingency volume.